TRANSOCEAN DISCOVERER SPIRIT

After successfully completing flooring & living quarters upgrades on several Transocean rigs, PCS was again selected by Transocean to perform IMO flooring repairs on Discoverer Spirit.

  • Project size: 4,500 SF
  • Project specs: remove and replace several types of existing floor coverings and underlayment that failed due to moisture intrusion, heavy traffic and maintenance issues
  • Existing floor finishes: ceramic tile, vinyl and carpet
  • Areas upgraded: male and female change rooms, ET and electrical shops, aft common office, conference room, and bathroom

Key Considerations for the project included the following:
Maintenance/Safety: Transocean chose to upgrade to a flooring system that provided a longer life span, required less maintenance, and prevented corrosion and bacterial growth.

IMO Approvals: The new flooring system needed to be IMO and U.S. Coast Guard approved.

Project Timeline: This project needed to be completed while the drillship was being towed from its current location in the Gulf of Mexico to its new location in West Africa.

Construction Management: Transocean preferred a turnkey upgrade service for the complete removal and installation of flooring in the specified areas.

Marine Decking Products Used:

  • IMO CLAD – IMO Approved Epoxy Underlayment
  • PolySpec® FLEX IMO – IMO Approved Flexible Decorative Chip Seamless Floor

View Transocean Discoverer Spirit Project Profile

back to profiles page

TELL US ABOUT YOUR NEXT PROJECT.

Hire PCS Construction Group for your next project and discover the benefits of single source construction management.