ENSCO is a leading offshore oil and gas drilling contractor with 45 rigs in operation. This project required the removal and replacement of 12,000 SF of ENSCO #7500 oil rig’s original floating floor, which had failed after only four years in service. In that service time, moisture had collected beneath the floating floor, presenting significant corrosion hazards. The entire project had to be completed within 45 days.
Marine Decking Products Used:
- PolySpec® 7K – Deck Top Magnesite Insulation
- PolySpec® FLEX IMO – Vinyl Chip Flexible Seamless Floor