PCS PROJECT PROFILE - TRANSOCEAN DISCOVERER SPIRIT

After successfully completing flooring & living quarters upgrades on several Transocean rigs, PCS was again selected by Transocean to perform IMO flooring repairs on Discoverer Spirit.
  • Project size: 4,500 SF
  • Project specs: remove and replace several types of existing floor coverings and underlayment that failed due to
    moisture intrusion, heavy traffic and maintenance issues
  • Existing floor finishes: ceramic tile, vinyl and carpet
  • Areas upgraded: male and female change rooms, ET
    and electrical shops, aft common office, conference room, and bathroom

Key Considerations for the project included the following:
Maintenance/Safety: Transocean chose to upgrade to a flooring system that provided a longer life span, required less maintenance, and prevented corrosion and bacterial growth.

IMO Approvals: The new flooring system needed to be IMO and U.S. Coast Guard approved.

Project Timeline: This project needed to be completed while the drillship was being towed from its current location in the Gulf of Mexico to its new location in West Africa.

Construction Management: Transocean preferred a turnkey upgrade service for the complete removal and installation of flooring in the specified areas.

Marine Decking Products Used:

  • IMO CLAD - IMO Approved Epoxy Underlayment
  • PolySpec® FLEX IMO - IMO Approved Flexible Decorative Chip Seamless Floor
View Transocean Discoverer Spirit Project Profile (.pdf)

>>>> back to Maritime Industry Project Profiles page
>>>> back to main Project Profiles page




 
Call us at 281-453-4390.
Email us now. | Fill in our form request.
See our latest project profile for a chemical resistant system installed at a process unit for energy giant NRG. Read it now.

PCS attends the Buffalo Marine christening service of their four new boats:
• M/V Lt. Dick Dowling
• M/V CJ Studdert
• M/V Nancy Marian
• M/V San Roberto

Houston, TX

PCS begins LCS 16 at Austal USA
Mobile, AL

PCS completes new deck renovations for Yazoo River Towing at Big River Shipbuilders
Vicksburg, MS

PCS completes ceramic tile work for new vessel for Golding Barge Lines
Port Neches, TX

PCS begins interior deck coverings for Shell Appomattox living quarters at Stallion Offshore
Abbeville, LA

PCS completes decking renovations on M/V Tradewinds at Sneed Shipbuilding
Channelview, TX

NEED RIG RENOVATIONS? POLYINSPECT:
PCS now allows facility owners to expect more from their flooring and decking systems through a new service called PolyInspecT. This innovative service involves an annual inspection of the deck coating system and provides a wealth of information. Schedule yours today.
© 2017 PCS | 281-453-4390 | P.O. Box 159 | Mont Belvieu, TX 77580-0159
Terms | Privacy | Site Map | Site Design